Off and Running in 2012

STS is one step closer to their new facility.  The new construction to be located in Oak Ridge North Commerce Park will consist of two buildings containing 66,875 SF.  Both buildings (31,875 SF & 35,000 SF) will be pre-engineered with a 29’ eave height.  The manufacturing buildings will be designed for two 10 – ton cranes.  The site will consist of roughly 140,000 SF of paving for heavy duty traffic, storage and parking.  STS manufactures accumulator units which are primarily used to operate the B.O.P. on drilling rigs.  The company is also the western hemisphere distributor for SARA Sae, a manufacturer of pipe fittings, flanges, wellhead crosses and tees, API RTJ gaskets and Flow Iron.  The project is currently in the design phase and we are anticipating a winter 2012 completion.

This entry was posted in Commercial Construction, Design Build, Metal Building Construction. Bookmark the permalink.